The importance of packing glands correctly cannot be over-emphasised. Many packing failures are due to incorrect installation of the packing. The following steps have been devised to ensure effective installation of packings on pumps and valves.
Packing The Pump Correctly
- REMOVE ALL THE OLD PACKING FROM THE STUFFING
BOX. Clean box and shaft thoroughly
and examine shaft or sleeve for wear and scoring. Replace shaft or sleeve
if wear is excessive.
- USE THE CORRECT CROSS-SECTION OF PACKING
OR DIE-FORMED RINGS. To determine
the correct packing size, measure the diameter of the shaft (inside
the stuffing box area if possible) and then measure the diameter of
the stuffing box (to give the OD of the ring). Subtract the ID measurement
from the OD measurement and divide by two. The result is the required
size.
- WHEN USING COIL OR SPIRAL PACKING, ALWAYS
CUT THE PACKING INTO SEPARATE RINGS. Never wind a coil of packing into a stuffing box. Rings can be cut with
butt (square), skive (or diagonal) joints, depending on the method used
for cutting. The following illustration shows these methods of preparing
bulk packing. The best way to cut packing rings is to cut them on a
mandrel with them same diameter as the shaft in the stuffing box area.
If there is no shaft wear, rings can be cut on the shaft outside the
stuffing box.
Hold the packing tightly on the mandrel, but do not stretch excessively. Cut the ring and insert it into the stuffing box, making certain it fits the packing space properly. Each additional ring can be cut in the same manner, or the first ring can be used as a master from which the balance of the rings are cut.
If the butt cut rings are cut on a flat surface, be certain that the side of the rings, and not the OD or ID surface, is laid on the rings to be cut. This is necessary so that the end of the rings can be reproduced.
When cutting diagonal joints, use a mitre board so that each successive ring can be cut at the correct angle.
It is necessary that the rings be cut to the correct size, otherwise, service life is reduced. This is where die cut rings are of great advantage, as they give you the exact size ring for the ID of the shaft and the OD of the stuffing box. There is no waste due to incorrectly cut rings.
- INSTALL ONE RING AT A TIME. Make sure it is clean and has not picked up any dirt in handling.
Seat rings firmly (except PTFE filament and graphite yarn packings, which should be snugged up very gently, then tightened gradually after the pump is on stream). Joints of successive rings should be staggered and kept at least 90 degrees apart. Each individual ring should be firmly seated with a tamping tool. When enough rings have been individually seated so that the nose of the gland will reach them, individual tamping should be supplemented by the gland.
- AFTER THE LAST RING IS INSTALLED, TAKE
UP BOLTS FINGER TIGHT OR VERY SLIGHTLY SNUGGED UP. Do
not jam the packing into place by excessive gland loading. Start pump,
and take up bolts until leakage is decreased to a tolerable minimum.
Make sure gland bolts are taken up evenly. STOPPING LEAKAGE ENTIRELY
AT THIS POINT WILL CAUSE THE PACKING TO BURN UP.
- ALLOW PACKING TO LEAK FREELY STARTING
UP A NEWLY PACKED PUMP. Excessive
leakage during the first hour of operation will result in a better packing
job over a longer period of time. Take up gradually on the gland as
the packing seats, until leakage is reduced to a tolerable level, preferably
8-10 drops per minute per inch of shaft diameter.
*** NEVER TRY TO STOP A LEAKAGE ENTIRELY ***
- WHEN SPECIFIED BY THE PUMP MANUFACTURER,
PROVIDE MEANS OF LUBRICATING THE PACKING THROUGH THE LANTERN RING BY
SUPPLYING WATER, OIL, GREASE OR LIQUID HANDLED IN THE PUMP. Fittings for this purpose are standard on many
pumps. Flush pressure should be minimum 1 bar above stuffing box pressure.
- IF THE STUFFING BOX HAS A LANTERN RING
(SEE ILLUSTRATION ABOVE), make sure
that the lantern ring, as installed is slightly behind the fluid inlet
so that it will move under the inlet as follower pressure is applied.
- REPLACE PACKING WHEN LEAKAGE CANNOT BE
CONTROLLED BY FURTHER TAKE-UP ON THE FOLLOWER GLAND. DO NOT ADD MORE
PACKING RINGS.
- ON BOTH CENTRIFUGAL AND RECIPROCATING
PUMPS, ABOUT 70% OF THE WEAR IS ON THE OUTER TWO PACKINGS NEAREST THE
GLAND. However, each additional
ring does throttle some fluid pressure. On most pumps, there must be
enough rings so if one fails, another does the sealing, and the pump
need not be shut down.
The mechanical pressure curve above shows eight packing rings. THe first five rings do the majority of the sealing. The bottom three rings do little sealing, but are needed to fill the available space. The advantage of using fewer rings is less rod wear. Also, the stuffing box design is simpler and takes less material. But wear isn't the only problem. With high temperatures, high pressures, corrosive chemicals, or abrasive particles in the fluid, more rings may be the only solution for some services. In such cases, the bottom ring contacting the fluid may have the most wear from these severe service conditions.
Packing Valves Correctly
As with pump packing, the first step in getting the most out of a valve packing is correct installation. Here is the correct way to pack valves.- CAREFULLY PERFORM ALL OPERATIONS AS LISTED
UNDER PUMP PACKING STEPS 1 TO 5. Rings
used on valves and expansion joints are cut with a skive joint (illustrated
below). If preparing butt or skive cut (45 degree) rings, be sure that
the first ring is cut carefully, and then tested on the stem.
- BRING THE FOLLOWER DOWN TO THE POINT
WHERE HEAVY RESISTANCE TO WRENCHING IS FELT.< During
this time, turn the valve stem back and forth to determine ease of turning.
Do not torque down to the point where the stem won't turn.
- STROKE THE VALVE SEVERAL TIMES AFTER
THE VALVE HAS BEEN IN SERVICE A DAY OR SO, EVEN IF NO LEAKAGE EXISTS,
THE FOLLOWER SHOULD BE TIGHTENED SLIGHTY. Obviously
if leakage occurs, the follower must be tightened.